Input
A fictional project needs refreshed client education material.
Daymark controlled preview
Static trust and routing surface for source-governed AI work.
Workflow Path / source to packet
Guided source-to-review path using fictional Northstar Advisory Studio demo data only.
Internal Draft / Review Required
Input
A fictional project needs refreshed client education material.
Control
The route shows which sources and context packs are allowed into the draft path.
Review
The output remains draft until gate, owner, and route are clear.
Packet
The work can only move once the destination is explicit.
Static demo scenario
This route shows the minimum controlled path for one fictional project: source review, context preparation, draft output, review gate, and packet destination.
Project
PRJ-DEMO-001
Sources
SRC-DEMO-003, SRC-DEMO-004
Context Pack
CTX-DEMO-002
Output
OUT-DEMO-002
Gate
GATE-DEMO-002
Routing Packet
RTE-DEMO-001
Source basis comes before context prep.
AI output remains draft until reviewed.
Public-facing reuse stays gated.
Routing is explicit before integration.
Six-step walkthrough
These cards are static. They explain the operating model without creating workflow automation.
Step 1
Owner: Northstar Advisory Studio
Blocker: Public claims guardrail must be checked before reuse.
Review route: PSB + RCB
Next action: Review the current-state record before preparing AI context.
Step 2
Owner: Source Owner
Blocker: Voice guide needs review before public-facing reuse.
Review route: Source Review + RCB
Next action: Confirm what governs and what does not govern.
Step 3
Owner: Education Owner
Blocker: Archived and sensitive placeholder sources must remain excluded.
Review route: AIQA + LPC
Next action: Check included, supporting, and excluded source sets.
Step 4
Owner: Education Owner
Blocker: Two lines need softer wording before reuse.
Review route: AIQA + RCB
Next action: Review output as draft and route claim-risk language.
Step 5
Owner: Public Surface Board
Blocker: Public-facing reuse requires review.
Review route: PSB + RCB
Next action: Confirm gate status before packet routing.
Step 6
Owner: Review Owner
Blocker: Destination must be explicit before integration.
Review route: PSB + RCB + AIQA
Next action: Route the output to the correct review destination.